BASE PERMT INFO
Plan Review Deposit:
Yes
Scope Code:
M1 Multi Family Building
Application Square Footage:
279334
SITE DEVELOPMENT
Site Inspection Multi Family:
Yes
Pipe Inspection Storm 12+ Inches:
553
Pipe Inspection Sanitary 8+ Inches:
376
Pipe Inspection Storm & Sanitary Structures:
31
Sewer Connection Inspection Multi Family:
1
Driveway Inspection:
64
Sidewalk Inspection:
651
Curb & Gutter Inspection:
104
NPDES:
Yes
Total Acreage:
2.01
Disturbed Acreage:
1.70
Performance Bond Req'd:
Yes
Amt/Acre:
3000
Cut and Fill:
44033
Excavation Bond Req'd:
No
Amt/Cu Yd:
10
Bond Amount:
0
State Waters:
No
Flood Zone:
No
Flood Zone2:
No
Wetlands:
No
Ga EPD Buffer Variance Required:
Yes
Ga EPD Buffer Variance Received:
Yes
CoA Streambank Buffer Encroachment Required:
Yes
CoA Streambank Buffer Encroachment Received:
Yes
Sewer Tap Form Required:
Yes
Stormwater Mgmt Facilities Required:
Yes
Operations & Maintenance Plan Received:
Yes
Inspections & Maintenance Agreement Received:
Yes
Dedicated Infrastructure:
No
ZONING
NPU:
E
NPU Associated 1:
C
SPI Zoning:
undefined
Beltline District:
BELTLINE
CDP Land Use:
HDC
Council District:
6
District:
17
Land Lot:
110
Zoning 1:
C-3
Zoning Overlay:
BELTLINE, BH P OLA
Historic Building and Properties:
undefined
Flood Zone 1:
X
Flood Zone 2:
undefined